Anyone help - lookinjg through tg20 - there is no mention of a cantilvered scaffold as being within a basic scaffold - we have a 9 lift high (2m lifts) 13m long - top lift cantilevered - should this therefore have a design. There are 3 inside boards and 4 boards between standards?
Also - in tg20 figure 7 Town and country diagrams - there are no T factors on this - what use is this - I must be being thick??????
Also - in tg20 figure 7 Town and country diagrams - there are no T factors on this - what use is this - I must be being thick??????