This is probably a difficult question but I need some advice from guys in the sector.
I called the council to ask for a permit to erect scaffolding which instigated an inspection which then resulted in a dangerous buildings notice.
The council then arranged for emergency scaffolding to be erected which was in place for 28 days. I have now been issued with a bill for £12,000.
(7.5 to erect and design 3.5k to take down plus vat)
1days work mornings work
Could this be correct? (i originally thought it was a typo)
Any help or pointers would be much appreciated.