1969scaff
Well-known member
Just started a new site in Manchester,tube and fittings. everything done to drawings.Brickies lifts, progressive.Loading bay to take pack of brick or block plus tub of mortar;15 standards,12 transoms, locking lift,every standard braced,standards laced through under transoms on doubles(Aberdeen transom?) with check fittings on every standard.Total fittings 150!!!Now call me old fashioned but is that completely over the top?Of course it was designed by some design engineer who has never touched a scaffold in his life.God help us if we have to do a major support job!!!!!!!!!