A client of mine has constructed a temporary roof, and has hung the monarflex vertically from top to bottom!
My design states that the monarflex should be installed in accordance with manufacturers instructions, which covers me.
Now in all the time ive been scaffolding, ive put monarflex on horizantally around each lift, which i believe to be correct. Is there a wrong/right way of doing it? Where is the documentation to prove?
After abit of research, there doesnt seem to be any guidance on how it should be installed i.e a BS or a chapter in TG20. Not even the manufacturers have specified.
My design states that the monarflex should be installed in accordance with manufacturers instructions, which covers me.
Now in all the time ive been scaffolding, ive put monarflex on horizantally around each lift, which i believe to be correct. Is there a wrong/right way of doing it? Where is the documentation to prove?
After abit of research, there doesnt seem to be any guidance on how it should be installed i.e a BS or a chapter in TG20. Not even the manufacturers have specified.