allan666
Well-known member
if a 13 ft board needs supporting every 1.2 m does that mean if you double them up you could span 2.4 m. i have had to stop and start a scaffold at a doorway then join it up on the second lift ,they have now decided they need to work above the door . the bays less than 2m s and i already carried the handrail through when erecting the first lift . iv lapped the gap with doubled up boards loads of times in the past but im trying to keep up with the times. any ideas if this is ok