marra watson
Moderator
To me hanging or building the top will be compressed the bottom tension
ah yes when the beam is use supported between two point the top cord is allways going to be in compresison and bottom tension but if its sailed out the bottom becomes compression and the top tension so does this mean the beam should turned the oppisite way on a beam sailed out to 1 used for bridging is what am after ?
sss what i think joebag means am maby rong is that as a part two you can go out an put a job up legally but only to the 2nd lift after that you would need a scaff that had got the testing cert,to be able to tie test and build higher. how would a day to day part two go about changing what on the training ? in part 2 would they hold any weight in presenting this to cisrs ? or do you think it would hold more weight if coming from an instructor like your self surly instructors do have some in put or weight to conserns, do you thing the part 2 course would benafit a scaffolder if they came away form it with a tie test traing and cert?