who got the work on the rigs up in invergordon?

i no capes had some work in the dry dock that they took off macdonalds my mates were on there before christmas
 
I think McDonald's took it all back from cape that was the rumour when I was up there
 
thanks for the feed back. i was up there before xmas aswell but when i was up where the word going about was that there was 3-4 more rigs coming in needing MOT, ere is not alot of work going aboot at the momant and would'ent mind getting back up there.
 
alright mate i. how u doing . just done my bosiet before christmas but work is slow at this time off yr . doing casual the now. cant beleive some off the scaffs up in invergordon half them never even had a clue.
 
alright mate i. how u doing . just done my bosiet before christmas but work is slow at this time off yr . doing casual the now. cant beleive some off the scaffs up in invergordon half them never even had a clue.
A lot of guys were capes men from power stations and that never seen a rig in there life, capes under priced job by over 2 million still only completed half or something, rig passed me last week went in for full paint job came out half painted with N U FC written up one of the legs. Can't c cape getting much work up this way again.
 
cannit see it being the local lads writing NUFC on a leg to be honest teeside, should a sent a bunch of noncing whinging smoggies up then
 