Hi can anyone tell me the best way to base out a splay scaffold for a tank looked on google but can't find anything.A drawing would be good thanks.
Hi can anyone tell me the best way to base out a splay scaffold for a tank looked on google but can't find anything.A drawing would be good thanks.
im going to use tube and fittings
Sorry wrong pageDepending on the distance you need to be from the tank or vessel base out t&f towers and link together. Lapping the boards is ok.
---------- Post added at 08:19 AM ---------- Previous post was at 08:06 AM ----------
Are you doing the same job?
---------- Post added at 08:20 AM ---------- Previous post was at 08:19 AM ----------
Or is it because you are both in NZ?
Are you using system or tube and fittings?
Thanks,seen someone do it in singles looks like a tidy job.Measure the total diameter of the tank, find a number that divides equally in to , that will give you number of bays or towers to be erected... or if you have mills doubles go the route of putting your ledgers alternately inside-outside of your standard, this is a fairly technical method of erecting and you would need a lot of short boards ie:-8's 6's 5's 4's and so -on, personally i'm against the lapping of boards on a splay, but if who-ever is tagging the job is ok with multiple tripping hazards on a working platform then go with it...I would also be seeking advice from your supervisor/chargehand.
hope this helps.
Measure the total diameter of the tank, find a number that divides equally in to , that will give you number of bays or towers to be erected... or if you have mills doubles go the route of putting your ledgers alternately inside-outside of your standard, this is a fairly technical method of erecting and you would need a lot of short boards ie:-8's 6's 5's 4's and so -on, personally i'm against the lapping of boards on a splay, but if who-ever is tagging the job is ok with multiple tripping hazards on a working platform then go with it...I would also be seeking advice from your supervisor/chargehand.
hope this helps.
Thanks,seen someone do it in singles looks like a tidy job.
Seen that stroke pulled many a timeThe best way of dealing with a splay if u've not done one b4 is to fain an illness & take a couple of days off....then when you come back...like a miracle the scaffold fairys will have erected in your absence....or just go & have a really really really long shiiit and when you get ba k someone else will have startedbit for you & alls you have to do is follow below....simples![]()