To be honest i've never really looked at the calculations.
If the designer has done the design and sent the calcs and it's been checked by another designer i would imagine it's covered.
The designer has to have his qualification to allow him to carry out the design so that would overrule anything I could do, the Temporary Works Forum released a Scaffolding Management document for BS5975 that might be worth looking at.
Bookmarks