If I'm erecting a 28m tower x 3.5 wide in layher, how many buttress bays do I erect around the base of the tower. Do I just erect 9m (3 x 3m bays) behind the scaffold or do I support the sides as well with buttress bays to avoid side to side movement. I'm not able to anchor to face of building. Any advice or guidelines?