1.5m x 1.5m craneable tube and fitting tower. (2 Viewers)

If the standards aren't one-piece you would need to splice the joints, usually using a short tube and 2 swivels to each side of the sleeve. A tower will be braced to full height on all 4 sides and plan braced at top, bottom and alternate lifts anyway so no need for additional bracing there. I would also add ladder beams at the top lift for lifting, laced and braced as per best practice. The last thing you need to consider is possibly having base jacks, securely held in place, to enable you to level the tower once its been moved to the new position.
 
Top Bottom