Im looking for details, do's and don't , about this tie,
I've got a 4 to 5 lift timber frame job coming up and there's no room for buttress so thinking of using the ejot tie, or could I get away with using self tapper rings in the concrete block as the block is built up progressively?
Cheers in advance
John
I've got a 4 to 5 lift timber frame job coming up and there's no room for buttress so thinking of using the ejot tie, or could I get away with using self tapper rings in the concrete block as the block is built up progressively?
Cheers in advance
John