harness clip on

jayjay1971

Member
Joined
Sep 22, 2010
Messages
5
Reaction score
0
hi to all how far off the floor ave u got to be before u ave to clip on
 
You have to be clipped on before you leave the floor if your using scaff step :D
 
Or if advanced guard rail in place just when lowering or raising boards.
 
Where practical, a handrail or other collective protection should be in place. If this is not practical then the attachment of harness/lanyard should be considered. As a rule of thumb, SG4 stated that attachment should be at 4m + from the anchor point as any less would be pointless.
 
Top Bottom