PDA

View Full Version : No drawing or engineer's report, done it of the top of Ma scratcher our health & safe



DOG1
30th August 2016, 10:27 PM
http://uploads.tapatalk-cdn.com/20160830/a0a56dbb89246c8a824dbedc3a340717.jpg


Sent from my iPhone using Tapatalk

fortyeight
2nd September 2016, 07:33 AM
whats hard about it ,old school did every thing off the top off our scratshers,but it does look ok ,i see youve used beems ,weed have done it without beems

DOG1
2nd September 2016, 05:12 PM
Just asking if it looked OK, got a verbal beat Doon Fae oor health & safety for daen it without a drawing, had me on the bad boy step & a 100 lines, he wasn't a happy bunny, attacking me wi all the what if this happens or that happens, he pulled the tag on it till he'd done his sums & still gave me detention[emoji85] working in tesco's noo


Sent from my iPhone using Tapatalk

fortyeight
3rd September 2016, 11:17 AM
trying to show his power,he might think your after his job,the sad man,what has happend to this trade ,eu power

stonedrose1
4th September 2016, 07:48 PM
I reckon they'll come back and tell you to have another couple of 'dummy' lifts between the beam work and the first (second?) lift you access from the top. That and countless more 'supplementary couplers' and bracing.

pups71
4th September 2016, 10:36 PM
dog1
easy to see the problem with this.... you forgot the hand rail running parallel with the ladder angle...how is Tesco working out...lol

outward bound
6th September 2016, 04:40 AM
although a lot of us are able to do things of this nature it comes down to liability if something did happen.. unless you are able to prove in technical terms that was safe in a court of law then you would be screwed