Lifting beam design

bigfish

Moderator
Joined
Aug 25, 2011
Messages
3,137
Reaction score
0
Location
flintshire
Has anyone got a simple generic design for a lifting beam/point,it's only to hold 200kg 2m pipe section 5m off the floor,not bothered if it's rated higher:)oh,forgot to say please:D

email spscaffold@gmail.com
 
yeah ill run ya threw it

  • get your lightest lab
  • get him on your strongest labs shoulder
  • now get another lab to pass the object to the first lab
  • from the first lab then get him to pass it on to the lightest lab on his shoulders
  • then get the lab on the sdhoulders to lock out his arms
  • simples
 
yeah ill run ya threw it

  • get your lightest lab
  • get him on your strongest labs shoulder
  • now get another lab to pass the object to the first lab
  • from the first lab then get him to pass it on to the lightest lab on his shoulders
  • then get the lab on the sdhoulders to lock out his arms
  • simples

Ffs marra,you've even covered the method statement there:)you're wasted on them elsie's pal:Dany luck yet with the job search pal??
 
sorta got me cscs test to do thursday lasso recons it harder since april and has lodza sh1t in from chemical and confined spaces and sh1t lol then got a days work and see from there seems all good propper out fit not like last mob :laugh:
 
i sent the one but it obviously never made it,sent it again about 1 hour ago have you received it.
page 47 onwards.;)
 
Before u use any generic drawing u must have the beam u are using tested or the drawing is useless.
 
Top Bottom