PICTURES: Scaffolding lift delayed at cathedral after workers don't order enough weights (From Hampshire Chronicle)



The metal will be lifted over the Cathedral Tower to provide temporary cover while 40 workers remove the lead roof, which is broken and leaking. (Alternative 2 pikeys required & Tranny Van)

The lead will then be melted down off-site and recast to last another 150 years
(not if they reroof with it & them 2 pikeys are lurking)
 
Last edited:
Following a prayer from vice-dean Canon Roly Riem, the first section was lifted into place just before 09:00 GMT

The vice dean obviously know you Teeside :)
 
how much would a firm charge for a job like this?
 
Good old Blencowe's they got it up there in the end lol but tbh think i'd have run the sheets through whilst it was on the ground...."up the big orange" lol
 