    Default Help with my nvq for my part 2

    Hi all I am having some trouble with some of my questions for my NVQ, so was hoping some one could help

    Q1. On a cantilever scaffold which point of the scaffold is known as fulcrum point?
    Q2. Explain what the chords are in relation to prefabricated beams used for scaffolding?
    Q3. When using prefabricated beams, which chord should be plan braced compression or tension?
    Q4. How often are tie tubes required in the bottom chords of a pair of prefabricated scaffoldings beams?
    Q5. Can ladder beams be fixed together and used as columns?
    Q6. How can you improve the performance of prefabricated beams?
    Q7. Is a single guardrail adequate protection for a scaffolder to work within, in relation to for protection?
    Q8 what is the NASC code of practice covering fall protection for scaffolders working safely while erecting and dismantling scaffolding?
    Q9. State what equipment is associated with fall arrest?
    Q10. State the requirements that Anchorage points must fulfil?
    Q11. How would you clean your harness?
    Q12. States where procedures for rescuing a person from the floor while wearing a harness should be kept?

    Thanks in Advanced

  2. #2
    Join Date
    Oct 2011
    Location
    london
    Posts
    16
    Thanks
    2
    Thanked 3 Times in 3 Posts

    Default

    Is that what they ask you now days ?
    H8Scaff

  3. #3
    Join Date
    Sep 2012
    Posts
    22
    Thanks
    1
    Thanked 2 Times in 2 Posts

    Default

    And lots more

  4. #4
    Join Date
    Sep 2010
    Posts
    439
    Thanks
    9
    Thanked 314 Times in 186 Posts

    Default

    I am sure the lads on here will have no trouble answering these question for you?

  5. #5
    Join Date
    Sep 2012
    Posts
    22
    Thanks
    1
    Thanked 2 Times in 2 Posts

    Default

    That's the plan but no answers as of yet

  6. #6
    Join Date
    May 2012
    Location
    Somerset
    Posts
    252
    Thanks
    95
    Thanked 57 Times in 48 Posts

    Default

    Q4 tied tubes in the bottom of the beam are usually half of how many tie tubes in the top of the beam
    Q2 if I think I'm correct the cord are wat would be the ledgers running on top an bottom off the beam if that makes sense =======
    | | | | | | Beam cords top an bottom
    =======
    Q3 is tension I think bin a while any one quote me if I'm wrong
    Q7 yes a single gaurd rail if erected in correct manor as in a safe means to get up to next lift
    Q9 lanyard
    Q10 the anchorage point must be securely fitted if ledger flexed at 2 points same as guardrail
    Q11 in clean warm water

    ---------- Post added at 07:11 PM ---------- Previous post was at 07:11 PM ----------

    Quote me if wrong on any

  7. #7
    Join Date
    Sep 2010
    Posts
    439
    Thanks
    9
    Thanked 314 Times in 186 Posts

    Default

    Q 8( SG 4:10) Don't wear a harness waste of time wont safe your life make you late for the pub.

  8. The Following User Says Thank You to instructor For This Useful Post:


  9. #8
    Join Date
    Feb 2010
    Location
    essex
    Posts
    276
    Thanks
    66
    Thanked 72 Times in 50 Posts

    Default nvq

    Q3: compression the top chord of the beam is where the plan bracing is fixed to. tg20
    Q11. brushed and hosed down is what i was told by my health and safety guy
    Q6: to improve the performance of haki beams they need to be doubled up ( piggy backed). prefabricated beams sorry
    Last edited by hemper; 11th September 2012 at 06:36 PM.
    ENJOY IT FOR WHAT IT IS

  10. #9
    stleger's Avatar
    stleger Guest

    Default

    once again a post that highlights the difference in training being dished out across britain. Im pretty sure most part 2's in scotland couldnt answer the first 6 questions.

    and as a recent part 2 attendee , i can categorically state the answer to the first 6 questions is not found anywhere in the part 2 course

    it seems in scotland we get cards for making up portfoilio's and getting them signed by anybody whereas in england people are actually being trained to a high level

    im struggling to understand why these questions would be relevant for a part 2 , maybe someone in england can enlighten me on how the training works and the paperwork required for an NVQ in england , in scotland we give out SVQ'S for free.

    Q6: give it to someone who gives a ****
    Last edited by stleger; 11th September 2012 at 06:46 PM. Reason: chancers that wear the gear but cant walk the walk

  11. #10
    Join Date
    Sep 2010
    Posts
    439
    Thanks
    9
    Thanked 314 Times in 186 Posts

    Default

    If you are erecting these type of structure you should be able to describe how each of the part function to deem competence.

Page 1 of 5 1 2 3 ... LastLast

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

New To Site? Need Help?