Page 1 of 2 1 2 LastLast
Results 1 to 10 of 11

Thread: Cuplok System Scaffold Product Training Scheme

  1. #1
    Join Date
    Jun 2012
    Posts
    23
    Thanks
    3
    Thanked 8 Times in 5 Posts

    Default Cuplok System Scaffold Product Training Scheme

    CISRS 2 Day SSPTS - Cuplok here in Nottingham on the 26th – 27th July 2012 (normally £325.00 Inc CISRS Card) Now only £250.00 + VAT
    Contact scockell@safetyaccess.co.uk to book now!!

  2. #2
    Join Date
    Feb 2010
    Location
    Argyll
    Posts
    14,619
    Thanks
    6,137
    Thanked 5,872 Times in 4,179 Posts

    Default

    What does that cover, is it just for Harsco's cuplock?

  3. #3
    Join Date
    Dec 2010
    Location
    Dundee
    Posts
    3,495
    Thanks
    1,568
    Thanked 1,637 Times in 1,056 Posts

    Default

    May Include Genlok, (But Whos Gonna Know)

  4. #4
    Join Date
    Feb 2010
    Location
    Argyll
    Posts
    14,619
    Thanks
    6,137
    Thanked 5,872 Times in 4,179 Posts

    Default

    It's a shambles if I'm honest Gerscaff. Scaffolds built with all sorts of mixtures, even had a drawing that required cup lock only even although Genlock has a better requirement for 3kn.

    I also had beaver trying to sell me some kit and when I told them we were not trained to build it she told me they were now owned by Altrad who also bought out Generation which doesn't really matter a jot as you are still trying to sell me U lock. Am I the only one who cares about which system I use and having the right training?

  5. #5
    Join Date
    Dec 2010
    Location
    Dundee
    Posts
    3,495
    Thanks
    1,568
    Thanked 1,637 Times in 1,056 Posts

    Default

    The Whole Scheme Is A Flaming Fiasco, But I Think Some Safety Men Enforce Things Because They Can Rather Than Any Other Specific Reason,Iv Worked With Interserve And Found Generations Kwikstage Ledgers. On My Card It Says Kwikstage Not Interserve Kwikstage.Same As Cuplok Not Harsco Cuplok.

  6. #6
    Join Date
    Feb 2010
    Location
    Argyll
    Posts
    14,619
    Thanks
    6,137
    Thanked 5,872 Times in 4,179 Posts

    Default

    Like everything else Gerscaff, it will be fine till something goes wrong then insurers up and down the land will use this as a get out clause.

  7. #7
    Join Date
    Dec 2010
    Location
    Dundee
    Posts
    3,495
    Thanks
    1,568
    Thanked 1,637 Times in 1,056 Posts

    Default

    Thats Always A Worry, God Knows We Pay Enough Insurance Premiums,

  8. #8
    Join Date
    Feb 2010
    Location
    Argyll
    Posts
    14,619
    Thanks
    6,137
    Thanked 5,872 Times in 4,179 Posts

    Default

    That's why I like to keep it simple, Genlock system, Genlock training and Genlock drawings. Maybe over thinking the whole thing but I can only shake my head when I see how others do it. Even on a training course once when they were trying to tell us all about scaffold safety, I asked they guy what manual he followed to build it as I could see 3 different types of cup lock on 1 wee tower.

  9. #9
    Join Date
    Dec 2010
    Location
    Dundee
    Posts
    3,495
    Thanks
    1,568
    Thanked 1,637 Times in 1,056 Posts

    Default

    Thats My Point, Iv Worked With Sgb (Or Harsco) And Interserve And Both Use Other Manufacturers Gear (Probably Cause Its Cheaper) They Dont Seem To Care, To Them Its Just Scaffold. And Just Money, Most Important Of All Money.

  10. #10
    Join Date
    Jun 2012
    Posts
    23
    Thanks
    3
    Thanked 8 Times in 5 Posts

    Default

    Just Harsco Original Cuplok.

    ---------- Post added at 12:26 PM ---------- Previous post was at 12:25 PM ----------

    Not Genlok. Not allowed under scheme rules.

Page 1 of 2 1 2 LastLast

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

New To Site? Need Help?